The Order You Should Pick Kitchen Remodel Finishes (So Appliances Don't Stall Your Cabinets)
The kitchen was one of my rooms in our renovation, so I understand the urge to start with backsplash tile and cabinet hardware. That's the fun part. Unfortunately it's close to the last thing your builder needs from you.
So much of a kitchen depends on something else being decided. The cabinet shop can't finish drawings without the appliance and sink sizes. The electrician can't place the pendant boxes until the island is settled. Nobody can template countertops until the base cabinets are in. Get the order wrong and you can end up with a crew waiting six weeks on a vent hood, or cabinets built around the wrong fridge width.
This is the order I'd go in.
First, appliances, sink and plumbing. Get exact model numbers for the range or cooktop, hood, fridge, dishwasher, microwave or speed oven, sink, faucet and pot filler. Send the spec sheets to your builder and your cabinet maker. "A 36-inch range, probably" doesn't count.
Second, cabinets. Door style, wood species, paint or stain color, pullouts, how wide the trash pullout is, toe kick and crown. Cabinets take a long time to build, so the sooner this is final the better.
Third, lighting and electrical. Pendant size and how low they hang, the color temperature of your recessed cans (2700K is warmer than 3000K), and under-cabinet lights. All of this needs to be decided before the drywall goes up.
Last, the pretty stuff. Countertop slab, edge and overhang, backsplash pattern and grout color, flooring transitions, and the size of your pulls and knobs.
If you can lock down the first two before demo, do it. It can be the difference between an eight-week kitchen and a six-month headache.
Start with our free kitchen remodel checklist organized in exact build order.